Washington Boulevard Medians

Message from Council President Herb Wesson:

Hello all, the long awaited Washington Boulevard medians are now in the process of being built. The work being done now is “soil remediation” there was some soil contamination from the old rail lines in the street. These are the road restrictions that will be in effect until the completion of the soil mitigation and median construction.

The traffic control measures will be in effect throughout the period of construction (no more than 120 days and quite likely less) and will be enforced 24hr./7 days a week and will include:

Left Traffic Lane closure on E/B Washington Bl.:

– Cloverdale Ave. to Orange Dr.

– Bronson Ave. to 4th Ave.

Parking Restriction (No Parking) on E/B Washington Bl.:

– Cochran Ave. to La Brea Ave.

– Crenshaw Bl. to Bronson Ave.

– 7th Ave. to Arlington Ave.

Left Traffic Lane closure on W/B Washington Bl.:

– 3rd Ave. to Bronson Ave.

– Mansfield Ave. to Redondo Ave.

Parking Restriction (No Parking) on W/B Washington Bl.:

– Arlington Ave. to Crenshaw Bl.

– La Brea Ave. to Redondo Ave.

Please pass on to your contacts, thanks

Sylvia Lacy
District Office Director, Council District 10
HERB J. WESSON, JR.
President, Los Angeles City Council

1819 S. Western Avenue 90006
Phone: 323-733-8233 Fax: 323-733-5833
Sylvia.Lacy@lacity.org

Catch Council President Herb J. Wesson on icon-social-instagram.png twitter-icon1.gif facebook_icon_small.gif

www.herbwesson.com

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s